December 2002 photos of the Main Library Project
click on photos for larger images

Half the glulam decking is installed on the eastern roof.
12/6/02
The interior roof line of the third floor has begun to take shape.
Design Drawing: Scoville Park elevation  12/6/02

Meyne Company workers perform finishing work in the parking garage level.
12/6/02
A section of the book return conveyor system in the ceiling.
12/6/02

The dry erase board in the Meyne Company trailer is updated weekly with the schedule.
12/9/02
Workers on lifts work with the glulam decking and glulam beams (here, still wrapped in green plastic).
12/9/02

The future front entrance is currently a wide plywood door.
12/9/02
Participants in the topping off ceremony write their names on a third floor column to mark the historic occasion.
Topping Out Ceremony                          12/9/02

Third floor openings on the south along Lake Street have been covered with plastic to protect the interior of the building from the weather.
12/13/02
The face brick work has been completed on the north side of the building.
12/13/02

A view from Scoville Park shows the glulam beams and the nearly completely installed glulam decking.
12/13/02
On the east side the glulam decking has been installed, completing the roof line.
12/19/02