August 2002 photos of the Main Library Project
click on photos for larger images

A crane moves a bundle of plywood to be used for formwork.
8/5/02

Shear walls at three central elevators are prepared.
8/6/02

Workers shape beams and plywood into the formwork for the first floor concrete slab.
8/8/02

Steel rods form a patchwork which will reinforce the concrete floor.
8/12/02

A portion of the first floor on the north side has been poured with concrete.
8/16/02

The south basement wall near the parking garage ramp is completed.
8/16/02

A view of the ramp area which will lead into the parking garage.
8/20/02

Half of the first floor concrete slab has been poured.
8/21/02

Work begins on formwork for columns on the first floor of the new builiding.
8/23/02

A view of the ramp area leading into the parking garage level.
8/27/02

Formwork for the first floor slab has been completed.
8/28/02

The Meyne company has completed the pouring of the first floor concrete slab.
8/29/02