August 2003 photos of the Main Library Project
click on photos for larger images

Colorful graphics on the glass wall feature panels surround doorways and the circular opening intended for an aquarium.
8/4/03
A view of the newly poured concrete plaza from the third floor reading area.
8/4/03

Installation of shelving on the third floor is nearing completion.
8/4/03
Shelving frames have been installed under the high ceilings and dramatic lights of the third floor.
8/4/03

Chairs for staff desks are corralled in the Booksorting Workroom.
8/5/03

Trees are ready to be planted in the landscaped area on the east side of the building.
8/6/03

July 2003 photosarrow

arrowOctober 2003 photos

back to top