June 2003 photos of the Main Library Project
click on photos for larger images

A view of the third floor collection area looking east.
6/2/03
The copper wall system is almost completed on the south east corner of the building.
6/1303

A view of the main staircase from the first floor.  Installation of the Terrazzo tread has begun.
6/13/03
The third floor collection area looking towards four glass-walled Group Study Rooms beyond the main staircase.
6/1303

New stone embankment wall and newly poured sidewalk cement between the new building and Lake Street.
6/23/03
Light fixtures in the third floor reading area.
6/30/03
Installation of the glass feature wall panels has begun on the third floor.
Interior Graphics             6/30/03

The exterior copper wall system has been completed.
6/25/03
A view of the main staircase from the third floor.  Installation of the Terrazzo tread is complete.
6/30/03
Third floor glass feature wall panels visible beyond the main staircase.
6/30/03