Oak Park Public Library

Home > Main Library > Construction > Timeline > August 2000


Timeline

1999
October
December

2000
January
March
July
August
September
October
December
2001
January
February
March
May
August
October
November
December

2002
January
February
March
April
May
June
July
September
October
November
December

2003
January
February
March
April
May
June
July
September
October

August 2000 events in the Main Library Project

Pre-design Orientation
Architects Don McKay and Dirk Danker of Nagle Hartray presented a Pre-design Orientation meeting for the Library Board of Directors in August 2000. Using slides, they introduced architectural concepts from other recently built and remodeled libraries as well as other buildings which surround the Main Library. They examined building materials, entry ways, stairways, ceiling heights and the use of glass and artwork with the goal of encouraging Board members to look at architectural designs differently.

Contracts for Preliminary Engineering Work and Traffic Study

The Library contracted for both a survey of the site and preliminary engineering work for Grove Avenue utility relocation with SDI Consultants.

site survey In addition, the Library contracted for a study with Kenig, Lingren, OHara, Aboona, Inc. to determine the traffic impact of the proposed new library building. The study, completed in September 2000, also considered the impact on nearby parking due to closing and vacating parts of Grove Avenue. The study analyzed the traffic impacts of existing conditions and future conditions assuming other future developments in the area. Capacity analyses were performed for critical intersections in the area as well as access points to the new library building.

soil sampling drillSoil Sampling
The Library contracted for soil sampling completed in early October 2000. The drilling company, PSI, drew core samples of soil from the proposed library site by drilling 80 feet underground in four separate locations.

soil sampling truck set up on vacant lot  north of library building soil sampling begins

July 2000arrow

arrowSeptember 2000